国产人成精品香港三级在,国产欧美日韩精品第二区,国产欧美成人一区二区三区

Main page Products certificates About us Contact
 
Products
 
New Products
Roadheaders
Mining equipment
Rock Tunneling
Shielding equipment
Drilling Rig for Coal Mine
Secondary Transport System
Drilling Rig
Truck-mounted Crane
Special Purpose Vehicle
Electric Parts
Hydraulic element
Typical Cases
 
 
 
Products
 

Using place
Xinwen Mining Group Dragon Energy Limited Longgu mine
Xinwen Mining Group in Inner Mongolia Energy Great Wall Mine
Xinwen Mining Group Huaheng mining companies
Kailuan (Group) Co., Ltd. Donghuantuo mine
Heilongjiang Long Coal Mine Group Hegang branch Jude coal
 
Roadway and geological conditions
 
■Full rock Roadway, rock hardness of f8 ~ f10, some parts can reach to f13
■Hard rock texture, closely arranged, no stratification
 
Roadway section and support form
 
■Xinwen Mining Group Dragon Energy Limited Longgu mine  section size(W×H)5.7m×4.95m
■ Xinwen Mining Group in Inner Mongolia Energy Great Wall Mine(W×H)5.2m×4.8m
■Xinwen Mining Group Huaheng mining companies section size 5.0m×4.8m
■Kailuan (Group) Co., Ltd. Donghuantuo mine   section size  W×H)4.8m×3.7m
■Heilongjiang Long Coal Mine Group Hegang branch Jude coal section size(W×H)5.0m×4.0m
■ support: bolting

Testimonials
 
■Longgu mine of Xinwen Mining Group Dragon Energy Limited has been using the EBH300 (A) cantilever road header so far, the best daily tunneling distance is 5.5 meters, the best month tunneling distance is 165 meters. The road header is always operated by remote controller, convenient and flexible; good hard - rock cutting ability, high efficiency, low consumption of pick; high loading efficiency, big power; high reliability of hydraulic and electrical components. It is superior performance, safety and reliability, and has reached the international advanced level, can meet all requirements of the rock tunneling, and can replace similar imported models.

■ The EBH300 (A) was put into use in Kailuan Group Donghuantuo mine in September 2011 and has been working so far, the first month of use created a new record of full rock tunnel boring. Roadway section is the semi-arched cross-section area of 20 square meters, daily cutting 9-9.6 m, the full month of 22 days, cutting distance reached 200.2 meters. The cutting stable, high efficiency, small cut picks consumption. Separate loading and delivering electric driving systems made it more adapted to rock roadway. It was equipped with imported advanced centralized lubrication system to ensure that all parts worked normally and reliably, at the same time, improve maintenance efficiency, reduce labor intensity.

 
 
Copyright:Shijiazhuang Coal Mining Machinery Co., Ltd. ICP:09037270
Design by:http://www.sjznet.net
    <span id="13evs"><nav id="13evs"></nav></span>

    <input id="13evs"></input>
      1. <input id="13evs"></input>
        <i id="13evs"><del id="13evs"></del></i>
        <bdo id="13evs"><del id="13evs"></del></bdo>
        主站蜘蛛池模板: 嘉黎县| 奉新县| 平江县| 长泰县| 岑溪市| 丰原市| 通山县| 黑水县| 克什克腾旗| 女性| 苍山县| 绵竹市| 长顺县| 吉木乃县| 玉环县| 闻喜县| 东乌| 泸西县| 黔江区| 康马县| 宜良县| 自治县| 广昌县| 和田市| 济宁市| 太仆寺旗| 麻栗坡县| 黑山县| 尼玛县| 屯留县| 惠东县| 吴桥县| 乳山市| 八宿县| 且末县| 肥西县| 天门市| 江口县| 湄潭县| 镇雄县| 永昌县|